Smithtown Library
Location
Smithtown, NYClient
Thermal SolutionsEquipment/Services
- LG Chiller and DFS Systems
- VTS Air Handlers
- Hydronic Specialties Equipment
- JCI & Honeywell Controls
Year
2025
Restoring Comfort and Control with Thermal Solutions After Major Floor at Smithtown Library: HVAC Overhaul
Overview
When a flash flood in August 2024 devastated Smithtown Library’s mechanical systems, time was of the essence. Klima New York partnered with Thermal Solutions, the project’s mechanical contractor, to rapidly supply and support the implementation of a new HVAC system—focused on speed, cost-effectiveness, reliability, and long-term design flexibility.
The Challenge
The flood left the library’s entire mechanical infrastructure inoperable, requiring a full HVAC system replacement under urgent conditions. Klima New York was brought in to supply the critical equipment and deliver expert controls integration to ensure a cohesive, high-performance system. Working alongside the mechanical contractor, Klima played a key role in meeting tight deadlines and high expectations for reliability, efficiency, and design.
The Solution
Klima New York worked closely with Thermal Solutions to deliver a fully integrated HVAC system tailored to the library’s layout and operational needs. The equipment package supplied by Klima included:
- LG Chiller and DFS Systems – Chosen for their compact footprint, energy efficiency, and proven reliability.
- VTS Air Handlers – Selected for their fast lead times, cost-effective pricing, and dependable performance,e and designed for effective ventilation and seamless integration with other system components.
- Hydronic Specialties Equipment – Including pumps, starters, and VFDs to enhance overall system performance while controlling costs.
- Klima Controls Integration – JCI and Honeywell platforms were integrated to centralize system control of the chiller, pumps, AHUs, and DFS systems.
- Klima coordinated directly with Thermal Solutions to ensure equipment delivery, setup, and controls commissioning were completed smoothly and on schedule.
Project Benefits
- Accelerated Implementation – Rapid equipment supply and streamlined coordination enabled on-time reopening.
- Cost-Effective Design – Equipment choices and integration strategies kept the project within budget without sacrificing quality.
- Reliable Infrastructure – Robust systems and centralized controls provide lasting performance and easier maintenance.
- Thoughtful Engineering – The entire system was designed for efficiency, flexibility, and long-term value.
Together, Klima New York and Thermal Solutions restored comfort and control to Smithtown Library—just in time for the grand reopening, with an HVAC system built to serve for years to come.