A Practical Solution to Budget Reduction

Objectives

425 Westchester Ave was a unique case for KLIMA. On top of ongoing challenges faced by the client, KLIMA was also tasked with budget reduction. The project was previously specified with alternative equipment but was ultimately over the allotted budget. Thus, the mission at 425 Westchester Ave became a two-fold problem — ultimately requiring a dynamic approach to resolution.

Problems

The property located at 425 Westchester Ave was plagued by a number of ongoing challenges, but the main problem centered around this property dealt with budgeting. The job was previously designed by an engineer, but was over budget. Ultimately, the owner requested a simplified solution that was both cost effective and more efficient.

Solutions

One of the biggest solutions to reduce the budget came through the rebate from the utilities KLIMA was afforded, which gave us ownership to use our VRF equipment.  Klima ultimately handled the application, worked with Con Edison, and crafted a custom rebate to get the owner a substantial amount of money back from the utility.  This revenue assisted in keeping the project on budget for the client.

Benefits

  • Fortified KLIMA’s design-engineering relationship
  • Demonstrated KLIMA’s construction aptitude — showing off company-wide system solutions inclusive of turn-key controls.
  • Allowed KLIMA to capitalize on our diverse equipment and controls offering, thus growing our company footprint

At a Glance

Challenges

  • Budget reduction
    • KLIMA was able to reduce the job’s budget at 425 Westchester Ave through a unique and individualized rebate.
  • Incorporating new system solutions in practical settings
    • KLIMA extended its growing company footprint by utilizing our latest and diverse equipment/controls offering to reduce costs. This job also provided us an opportunity to put this new technology to use in a practical setting.

Overview

  • Market Sector: Charter School and Mixed Commercial & Retail Building
  • Extent: Budget Reduction
  • Location: The Bronx

Ready to become our next success story?

View all case studies

645 Main Street

Read More

111 Linden St & 115 Linden St

Read More

22-60 46th St

Read More

531 Avenue of the Americas

Read More

National Grid

Read More

Building Energy Exchange (BE-EX)

Read More

Curry Acura

Read More

Fulton Market Building

Read More

SUNY Stony Brook – Toll Drive Residence

Read More

Perfume Center of America

Read More

111 Linden St & 115 Linden St

Location

Brooklyn, NY

Client

Equipment/Services

  • LG hydrokits
  • 2 LG heat-recovery VRF systems
  • An LG Central controller
  • PDI

Year

2024

Ready to become our next success story?

View all case studies

645 Main Street

Read More

22-60 46th St

Read More

425 Westchester Ave

Read More

531 Avenue of the Americas

Read More

National Grid

Read More

Building Energy Exchange (BE-EX)

Read More

Curry Acura

Read More

SUNY Stony Brook – Toll Drive Residence

Read More

425 Westchester Ave

Location

Bronx, NY

Client

AB Capstone

Equipment/Services

Year

2021

A Practical Solution to Budget Reduction

Objectives

425 Westchester Ave was a unique case for KLIMA. On top of ongoing challenges faced by the client, KLIMA was also tasked with budget reduction. The project was previously specified with alternative equipment but was ultimately over the allotted budget. Thus, the mission at 425 Westchester Ave became a two-fold problem — ultimately requiring a dynamic approach to resolution.

Problems

The property located at 425 Westchester Ave was plagued by a number of ongoing challenges, but the main problem centered around this property dealt with budgeting. The job was previously designed by an engineer, but was over budget. Ultimately, the owner requested a simplified solution that was both cost effective and more efficient.

Solutions

One of the biggest solutions to reduce the budget came through the rebate from the utilities KLIMA was afforded, which gave us ownership to use our VRF equipment.  Klima ultimately handled the application, worked with Con Edison, and crafted a custom rebate to get the owner a substantial amount of money back from the utility.  This revenue assisted in keeping the project on budget for the client.

Benefits

  • Fortified KLIMA’s design-engineering relationship
  • Demonstrated KLIMA’s construction aptitude — showing off company-wide system solutions inclusive of turn-key controls.
  • Allowed KLIMA to capitalize on our diverse equipment and controls offering, thus growing our company footprint

At a Glance

Challenges

  • Budget reduction
    • KLIMA was able to reduce the job’s budget at 425 Westchester Ave through a unique and individualized rebate.
  • Incorporating new system solutions in practical settings
    • KLIMA extended its growing company footprint by utilizing our latest and diverse equipment/controls offering to reduce costs. This job also provided us an opportunity to put this new technology to use in a practical setting.

Overview

  • Market Sector: Charter School and Mixed Commercial & Retail Building
  • Extent: Budget Reduction
  • Location: The Bronx

Ready to become our next success story?

View all case studies

645 Main Street

Read More

111 Linden St & 115 Linden St

Read More

22-60 46th St

Read More

531 Avenue of the Americas

Read More

National Grid

Read More

Building Energy Exchange (BE-EX)

Read More

Curry Acura

Read More

Fulton Market Building

Read More

SUNY Stony Brook – Toll Drive Residence

Read More

Perfume Center of America

Read More