Mount Sinai South Nassau Hospital
Location
One Healthy Way, OceansideClient
Premier MechanicalEquipment/Services
- Thermocomposite
- Walk-in vestibule
- Exhaust and supply fan arrays with ultra-premium PM motors
- Modulating speed control per motor
- N+1 fan redundancy
- Full factory installed controls
- Steam coil
- VSD compressors
- MERV 10 & 15 filters for hospital
Year

Objective
Design build replacement of existing Governair (no plans/specs).
Highlights
- Client confidence in Klima without an MEP
- Our unit proves to be 40% lighter than its comparable replacement. This feature is particularly crucial, especially considering its proximity to the maximum load capacity of 550 tons (135 ft boom, 195’ jib, and 300,000 pounds of counterweight).
- Factory installed controls to reduce downtime
Solution
Klima performed all unit, electrical, and duct measurements to align with existing conditions. The unit was then removed, installed, and started over a single weekend to accommodate the operational needs of the hospital.