Mount Sinai South Nassau Hospital

Project Profiles.

Go Back
Location
One Healthy Way, Oceanside
Client
Premier Mechanical
Project Scope
  • Thermocomposite
  • Walk-in vestibule
  • Exhaust and supply fan arrays with ultra-premium PM motors
  • Modulating speed control per motor
  • N+1 fan redundancy
  • Full factory installed controls
  • Steam coil
  • VSD compressors
  • MERV 10 & 15 filters for hospital

Objective

Design build replacement of existing Governair (no plans/specs).

Highlights

  • Client confidence in Klima without an MEP
  • Our unit proves to be 40% lighter than its comparable replacement. This feature is particularly crucial, especially considering its proximity to the maximum load capacity of 550 tons (135 ft boom, 195’ jib, and 300,000 pounds of counterweight).
  • Factory installed controls to reduce downtime

Solution

Klima performed all unit, electrical, and duct measurements to align with existing conditions. The unit was then removed, installed, and started over a single weekend to accommodate the operational needs of the hospital.

Ready to become our next success story?

Project Profiles

VIEW ALL PROJECT PROFILES

You don’t have to take our word for how versatile, dependable and rugged our products are or how great our service is. Take a look at some real examples of Klima products and systems in use by our customers.

VIEW ALL PROJECT PROFILES
Previous Slide
Next Slide
st-joseph-hospital-exterior

St. Joseph’s Hospital

Objective

Perlmutter Cancer Center - NYU Langone Huntington Medical Group

Perlmutter Cancer Center – NYU Langone Huntington Medical Group

The Phillips Family Cancer Center - Stony Brook South Hampton Hospital

The Phillips Family Cancer Center – Stony Brook South Hampton Hospital

Hudson Valley Hospital

Hudson Valley Hospital

Mastic Ambulance

Mastic Ambulance

HRH Care

HRH Care

Lutheran Health Care

Lutheran Health Care

3030 Westchester Ave

3030 Westchester Ave.

Community Ambulance Corp

Community Ambulance Corp